The second layer of prism elements has been assembled.
11 March 2005:
Two views of the first layer of prism elements bonded into place:
07 March 2005:
Bonding pads onto prism element.
Assembling the first layer into the frame.
Aligning the first layer.
09 February 2005:
Alan Schier has finished
fabricating the beamsplitter frame.
21 September 2004:
The beamsplitter calcite wedges arrived from OptoSigma, where they received
their antireflection coatings. There are a total of 18 wedges, which will be
used in pairs in a three by three array.