Southern African Large Telescope

Prime Focus Imaging Spectrograph

Code 3160: Fabrication and Test

Document Number Title Author Version Date Comments
SALT-3160BP0001 Optical Integration and Test Plan Burgh 1.1 25-Sep-2001 PDR
SALT-3160BP0001 Optical Integration and Test Plan Burgh 2.0 24-Feb-2003 CDR
SALT-3160BP0001 Optical Integration and Test Plan Burgh 3.0 03-May-2004
SALT-3160BP0001 Optical Integration and Test Plan Burgh 5.0 03-July-2007
SALT-3160AM0002 Interface Mounting and Alignment Plan Burgh 1.0 27-Nov-2001 Concept
SALT-3160AM0002 Interface Mounting and Alignment Plan Burgh 2.0 27-Feb-2003 CDR
SALT-3160AP0003 Instrument Acceptance Testing Plan Burgh 1.0 18-Feb-2003 CDR
SALT-3160AP0003 Instrument Acceptance Testing Plan Burgh 2.2 29-Apr-2004
SALT-3160AR0004 Instrument Acceptance Testing Report Burgh 1.0 04-Feb-2005
SALT-3160AR0004 Instrument Acceptance Testing Report Burgh 1.2 29-Apr-2005 Table and Text
SALT-3160AR0004 Instrument Acceptance Testing Report Burgh 2.1 22-Sep-2005 Table and Text
SALT-3160AP0005 RSS Throughput Test Plan Nordsieck 1.0 27-Jun-2006
SALT-3160AP0005 RSS Throughput Test Plan Nordsieck 2.0 14-Oct-2006
SALT-3160AP0006 Spare Electronics Acceptance Testing Report Percival 1.0 12-Sep-2007
SALT-3160AP0006 Spare Electronics Acceptance Testing Report Percival 1.2 11-Oct-2007
SALT-3160AP0006 Spare Electronics Acceptance Testing Report Percival 1.3 02-Nov-2007
SALT-3160AP0007 Summary of RSS-VIS Commissioning Observations Hooper & Nordsieck draft 31-Oct-2009
SALT-3160AP0008 RSS Functional Testing Procedure Nordsieck drafe 18-Aug-2010